Sky bridge
In February 2017, Preliminary Research Office was commissioned by a leading Chinese commercial drone company to design a pedestrian bridge between two towers which will become their headquarters in Shenzhen.
The body of the bridge is generated by the intersection of a set of conic volumes positioned along their common axis between the cores of the two towers.
At two points along this axis, perpendicular cones are introduced and split by the same primitive cones that generated the volume of the bridge. These perpendicular cones extend beyond the body of the bridge to create large platforms from which drones can be flown and observed, and which serve as meeting areas with expansive views of the surrounding city.
Adjacent to each platform, the bridge 'plugs in' to two enclosed structures that allow for additional circulation back to the towers. The two structures allow both vertical and horizontal circulation, and are attached to the exterior of the towers.
The bridge is split into two levels, meeting the first tower at the 28th floor and the second tower between floors 28th and 29th, with a staircase connecting both floors to the body of the bridge. The two levels within the bridge are connected by a large ramp that spans the two viewing platforms. Views into each partially-enclosed platform are generated by the level shift, and are visible when traversing the ramp.
Images and content courtesy of PRO.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing with 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.